SEE MORE IMAGES

225 rue de Li├Ęge O

Montreal Midtown
Download PDF

LEASING INQUIRIES

Michael Coughlin mcoughlin@redbourne.ca

Telephone: 514-940-1555 x 360   Fax: 514-940-1549

1555 Peel Street, Suite 700, Montreal (Quebec) H3A 3L8 Canada

AVAILABILITIES
Suite Floor Area
(sq.ft.)
Contiguous
Area(sq.ft.)
Availability
(mm/yy)
FLOOR
PLAN
SUITE
PLAN
200 2 31,557 53,113 Immediate N/A N/A
100 1 14,298 53,113 Immediate N/A N/A
101 1 7,258 53,113 Immediate N/A N/A
BUILDING SPECIFICATIONS
Built:1953
Floors:4 floors
Parking:145 exterior spots with the possibility of more parking in a shared lot on Bellarmin Street
Freight Elevators:loading dock and shipping facilities located behind building
Structure:Concrete frame
Elevators:The building is provided with one (1) passenger elevator and two (2) freight elevators that were installed by Armor in 1953. A new controller, AC motor and solid-state electronic VVVF drives for passenger elevator were installed in 2005
Air Conditioning:A mix of split units with roof mounted condensers and rooftop units are used to air conditioned the spaces via conventional steel or fabric ducts.
Heating:Heating for the building is supplied by either suspended unit heaters in the basement and most of the ground floor or wall mounted radiators on part of the ground floor and all of the upper floors. The unit heaters and radiators are fed steam from a single natural gas, cast iron steam boiler located in the basement mechanical room along with the condensate receiving tank. The Smith boiler, model 28A, with capacity of approximately 3400 MBH, dates from 2006.
Electric Supply:The building is serviced by one electrical entry (600 Volts) which is supplied by Hydro Quebec via pole-mounted transformers.
Lighting:In general, lighting is provided by T8 or T12 fluorescent fixtures in the manufacturing/warehousing areas. Decorative LED and fluorescent lighting fixtures have been installed in some of the office areas as part of the tenants fit-up of their spaces. Exterior light fixtures consist of wall packs installed on the exterior facades of the building.
Sprinklers:The entire building is protected by a wet sprinkler system, fire alarm system, emergency exit signs and fire extinguishers
After Hours Access:Access card system allows for entry 24/7.
Personnel:Maintenance personnel on site.
LOCATION
STACKING PLANS
2
31557
1
14298
7258